Posted by Aimee on November 7, 2007
I don’t have much for you this week. Not because I haven’t been knitting, but because I have been FINISHING what I have been working on.
I am now 10 chart rows from the end of clue 6. I have been working on this just about every night since last Thursday – just 5 (chart) rows [...]
Posted by Aimee on July 25, 2007
With the release of Harry Potter and the Deathly Hallows (Book 7) on Friday, a second trip to the eye doctor for a “dislodged” contact lens AND about 4 million other things, I got both more and less knitting done than I planned.
First, I got less done on the Mystery Stole then I planned. This [...]
Posted by Aimee on July 18, 2007
First up this week we have the Mystery Stole 3. Yes, I am a silly silly knitter knitting black lace weight while sitting on a black couch and usually wearing black pants or a black skirt.
See that pink line there? It is the end of Clue 1. I am now 14 rows into Clue [...]
Posted by Aimee on July 1, 2007
I had such lofty goals for today.
1) Knit Chart B of Clue 1 of the Mystery Stole2) Work on Candleflame.3) Bloack Lacey Lamb4) Finishing sleeve one of the pinwheel with the loop edge.5) spin the last bit of the roving I am working with6) work on the dream swatch7) house cleaning spend some time [...]
Posted by Aimee on June 17, 2007
I just bought a set of Knit Picks Options. These have been on the covet list for awhile even though I love my Denise Needles. The dainty cables are teeny in comparison to my Denise Needles and while I don’t expect I will love these more, I think I will love them just as much. [...]