A lot of work going on

by Aimee on March 12, 2008

This week I got a lot of work done on a lot of WIPs. No, really –
WIP Wed 03122008 004
Hemlock is off the needles and ready to be blocked.
WIP Wed 03122008 005
The hat of many ends is done and ready to be finished. I have decided to knot them all and call it a day – more on that later – like when it is done.
WIP Wed 03122008 002
I got 12 rows into each Bellocq last night before thinking about crawling into bed.
WIP Wed 03122008 003
I got half of Butterfly seamed.
WIP Wed 03122008 001
And I turned the heel on Tattoo Boyfriend’s Noro Sock.

{ 2 comments… read them below or add one }

Zonda March 12, 2008 at 7:59 pm

Whew..look at you cranking stuff out and you are sick..I’m a poor excuse for a knitter! ;)

Jen March 12, 2008 at 8:01 pm

Would the hat of many colors be for small children? Because then it might be fun just to knot them two at a time and wear the hat inside out! Also they could wear it regular even with knots because of all thoee plushy ends! (ETA: still binding off stitches on my edge. I’m on the 5th fan, but it just seems so wrong to add 4 stitches for every 2 you decrease….)

Leave a Comment

Previous post:

Next post: